Forms & Documents

NOTE: "ZDP" Application refers to Zoning Development Permit Application.

2025 Forms & Documents

  1. 2026 Accessory Dwelling Unit (ADU) Application
  2. 2025 Accessory Dwelling Unit (ADU) Yearly Affidavit
  3. 2025 Application for City Board, Commission, or Committee
  4. 2026 Board of Review Request (for PPRBD Building Code Variance)
  5. 2025 Code Compliance Complaint Form
  6. 2026 Demolition ZDP Application
  7. 2025 Domestic Fowl and Coop Permit Application
  8. 2026 Driveway Permit Application
  9. 2026 Fence-Dumpster Enclosure-Retaining Wall ZDP Application
  10. 2026 Final Plat Submittal Requirements
  11. 2026 Flood Hazard Development Permit Application
  12. 2026 General Development Application Form
  13. 2026 Grading Permit Application
  14. 2026 Historic Landmark Designation Application
  15. 2026 Home Occupation Permit
  16. 2026 Multi-Use ZDP Application
  17. 2025 Permit for work in the Right-of-Way
  18. 2026 Preliminary Plat Submittal Requirements
  19. 2025 Request for Deviation from Engineering Specifications
  20. 2025 SFR (Single Family Residence) ZDP Application - EFFECTIVE 4.01.2025 thru 12.31.2025
  21. 2025 SFR Dev. Fees (excluding Water & Sewer Tap Fees)
  22. 2026 SFR Driveway Information
  23. 2025 SFR Site Plan Example
  24. 2025 Short Term Rental - Good Neighbor Guidelines
  25. 2025 Short Term Rental Application
  26. 2026 Short Term Rental Application
  27. 2026 Sign Application for Permanent Signs ZDP
  28. 2026 Sign Application for Temporary and Portable Signs ZDP
  29. 2025 Sign Reface Form for Permanent Signs
  30. 2026 Site Plan Review Submittal Requirements
  31. 2026 Subcontractor and Vendor Lists
  32. 2025 Temporary Use Permit
  33. 2026 Use Tax Refund Submittal Letter
  34. 2026 Vacation of Interior Lot Lines and Public Easements or Establish Public Easements Application
  35. 2026 Vacation of Public Right of Way Application
  36. 2025 Water and Sewer Tap Fees with Worksheet for Commercial
  37. 2025 Water and Sewer Tap Fees with Worksheet for Residential
  38. 2025 Zoning Application & Development Fees (excluding water & sewer tap fees) - EFFECTIVE 3.1.2025 thru 12.31.2025